Project
Pool Installation
Beautiful pool interlock and stepping stone installation. Full backyard overhaul
Project type Pool Interlock Installation
Location Ancaster, Ontario
Timeline TODO timeline
Year 2022
Case study
The visible result depends on what was handled first.
A finished hardscape is only convincing when the site conditions, prep, drainage, and edges are handled before the surface goes down.
Existing condition
What needed to change
Customer had a 'blank canvas' backyard: all grass. Had drainage issues leading to a 'swamp' near their deck
Handled underneath
What had to be solved before the finish
- TODO document pitch away from entry
- TODO document tie-in to lawn or planting beds
- TODO note any downspout coordination
Finished result
What changed after the work
TODO replace with real outcome and customer-approved description.
Before / during / after
The work at each stage.
Site conditions, prep, installation, and handoff should all tell the same story.
Project record
Scope, materials, and timing.
TODO document pitch away from entry
- Scope of work
- interlock installation
- drainage system
- pool installation
- Materials
- Permacon Melville
- TODO base aggregate
- TODO joint sand or aggregate
- Timeline
- TODO timeline
Year: 2022
Contact me later
Leave the project details for later.
Leave a phone or email and your availability.