Before and after of a pool installation

Project

Pool Interlock Installation Ancaster, Ontario

Pool Installation

Beautiful pool interlock and stepping stone installation. Full backyard overhaul

Project type Pool Interlock Installation
Location Ancaster, Ontario
Timeline TODO timeline
Year 2022

Case study

The visible result depends on what was handled first.

A finished hardscape is only convincing when the site conditions, prep, drainage, and edges are handled before the surface goes down.

01

Existing condition

What needed to change

Customer had a 'blank canvas' backyard: all grass. Had drainage issues leading to a 'swamp' near their deck

02

Handled underneath

What had to be solved before the finish

  • TODO document pitch away from entry
  • TODO document tie-in to lawn or planting beds
  • TODO note any downspout coordination
03

Finished result

What changed after the work

TODO replace with real outcome and customer-approved description.

Project record

Scope, materials, and timing.

TODO document pitch away from entry

Scope of work
  • interlock installation
  • drainage system
  • pool installation
Materials
  • Permacon Melville
  • TODO base aggregate
  • TODO joint sand or aggregate
Timeline
TODO timeline
Year: 2022

Contact me later

Leave the project details for later.

Leave a phone or email and your availability.

Good times