Project
Pool Interlock Installation
A worn backyard pool area was rebuilt into a more usable patio, firepit, gazebo, and side-walkway layout with safer transitions and planned drainage.
Project type Pool, Patio, Firepit, and Walkway Installation
Location Burlington, Ontario
Timeline <1 Month
Year 2022
Before / during / after
The work at each stage.
Site conditions, prep, installation, and handoff should all tell the same story.
Before
Pooling. Weeds. Cracked Concrete. The potential was massive
- Homeowner noticed trip hazards, and excessive weed maintenance. It was time to beautify and solidify
Prep
Interlock Removal & Disposal
- All stones were either repurposed or recycled
Install
Beauty laid, stone by stone
- Drainage from walkway and side of the house were predetermined towards a drain
- Homeowners were able to use the area each day during construction
Finalize
Drainage checked, Polymeric Sand installed
- Can you see the transition from aggregate base to concrete?
- Polymeric sand is often installed incorrectly. We ensure it outlasts the expected lifetime
After
Now it's time to enjoy
- A firepit and gazebo flooring was installed alongside the beautiful new pool interlock
- The finished layout gave the homeowners cleaner walking routes, updated gathering areas, and a drainage path planned before installation.
Start the conversation
Start with what you see.
No measurements, material choices, or finished plan needed. Leave a way to reach you and we’ll take it from there.
Project start
Leave a way to reach you.
Choose how we should follow up. A short note is plenty.