Project
Complete Front Makeover
A beautification of the front
Project type Front Makeover
Location Freelton, Waterdown
Timeline TODO timeline
Year TODO year
Case study
The visible result depends on what was handled first.
A finished hardscape is only convincing when the site conditions, prep, drainage, and edges are handled before the surface goes down.
Existing condition
What needed to change
TODO replace with the real wall or slope problem. Example placeholder: failing wall with water pressure and soil movement.
Handled underneath
What had to be solved before the finish
- TODO document drainage stone and outlet approach
- TODO document uphill runoff sources
- TODO note if engineering review was required
Finished result
What changed after the work
TODO replace with verified result and owner-approved details.
Before / during / after
The work at each stage.
Site conditions, prep, installation, and handoff should all tell the same story.
Project record
Scope, materials, and timing.
TODO document drainage stone and outlet approach
- Scope of work
- TODO remove failed material
- TODO prepare compacted wall base
- TODO install drainage stone/backfill
- TODO final grading and cleanup
- Materials
- TODO wall block or stone
- TODO drainage aggregate
- TODO perforated drain pipe if used
- Timeline
- TODO timeline
Year: TODO year
Contact me later
Leave the project details for later.
Leave a phone or email and your availability.